0086-577-66688101
Product
Hydraulic Piling Frame System
JZB240 walking piling frame, jointly developed by beijing construction machinery comprehensive research institute and zhejiang zhenzhong construction machinery co.,ltd, is a new generation large-scale walking piling frame.
OnLine Service:
 Print this Page
 Bookmark this
 E-mail Us
 PDF Download
 Skype Online
【Prev Products】
【Next Products】
Product Details

JZB240 pile driver machine Walking Piling Frame for pile foundation works

JZB240 walking piling frame, jointly developed by beijing construction machinery comprehensive research institute and zhejiang zhenzhong construction machinery co.,ltd, is a new generation large-scale walking piling frame. The product features innovative design, rational structure, advanced technology, superior performance and stable and reliable application. It can be applied to a variety of foundation construction, especially to meet the soil mixing wall method. It is the ideal and efficient equipment for the foundation construction of highways, bridges, ports, docks, subway stations and high-rise building.

It has the following features

1, stable and efficient piling frame system

2, various power head, jackrod and drilling tool

3, comfortable cab, convenient and simple operating system for single person

4, convenient installation and transportation

5, provide inductive load angle monitor and deep mixing pile monitor, which are conductive to conduct operation and construction management

JZB240


Height of mast

39.52m

Mast supporting mode

3-point supporting type

Mast inclination

Forward12°

Backward 5°

Travel mode

Walking type

Lateral Travel speed

2.9/4.8m/min

Lengthways Travel speed

1.5/2.9m/min

Overall dimensions in operation

15.35m×9.6m×42.25m

Max. Extraction Force

710 kN

Main Winch pull(1st layer)

91.5 kN

Rope diameter

21.5mm

Drum capacity

550m

Winding speed

0~26 m/min

Auxiliary winch pull(1st layer)

72 kN

Rope diameter

20mm

Drum capacity

250m

Winding speed

0~32 m/min

Total Weight

138T


Packaging & Shipping

Delivery it without package and some parts should be packaged in wooden case.

And it’s better to delivery it in bulk ship.

JZB240 pile driver machine Walking Piling Frame works with power head

JZB240 pile driver machine Walking Piling Frame works with dual power head

JZB240 pile driver machine Walking Piling Frame works with power head in Wenzhou

Product Inquiry
If you have any enquiry about quotation or cooperation, please feel free to email us at zenzoom@zhenzhong.com or use the following enquiry form. Our sales representative will contact you within 24 hours. Thank you for your interest in our products.
看不清?点击更换
Feedback
Contact Us

Address: Jingye Road, Dongshan Economic Development Zone ,Ruian City,Zhejiang Province,China
Tel: 0086-577-66688101
Fax: 0086-577-65539928
E-mail:zenzoom@zhenzhong.com

Copyright © 2016 Atlantic Metal Products Limited .All rights reserved.


ZHENZHONG will attend the EXCON INDIA in Banglore. Date: 10th-14th DEC. 2019; We are looking forward to your visit!